Req.class/Check mode issue

$
0
0

Hi Experts,

I have created the custom "Requirement Class" in ECC. The availability check search methods in APO is based on the MRP type.

This setting has been made in the transaction ' Determination Of Requirement Types Using Transaction'

 

The issue is - in APO the check mode changes when the user changes the 'Requirement Strategy'  from strategy 10 (make to stock) to 40 (planning with finally assembly) in Material Master MRP screen.

 

ECC-For strategy 10 (make to stock) the default Req.class is 030 and It has assigned to 'Define Strategy' in PP

 

ECC-For strategy 40 (planning with final assembly) the default Req.class is 050 and it has assigned to 'Define Strategy' in PP

 

 

In this case the issue is - when I CIFF the materials at first from ECC to APO, The check modes are appearing in APO as standards -030 & 050. These are all copying from standards.

 

I need to go for all the hundreds of material then I need to change my custom CHECK MODE -K10 for all the thousands of materials.

 

Even If I change the check mode K10 manually for all the thousands of material at first time in APO then if the user goes to ECC material master data and changes any strategy from 10 to 40 or 40 to 10 then in APO check mode again populates the standard as maintained in the PP Define strategy.

APO check mode will not populate by default custom req.class K10.

 

My question is- Is there any enhancement/BADI available in CIF- no change happen in check mode in APO even if the material strategy changes in ECC frequently.