Resource Utilization Chart issue

$
0
0

Good afternoon,

 

I have a slight problem that I am unable to resolve and hope you may be able to help.

 

I have Planned and Production Orders loaded onto a resource, when I check the resource: periodic view in the Production Planning Table, I can see the orders are loading as required.

 

If I go into the Detailed scheduling board and open up the Resource Utilization Chart, it is blank.

 

I have double checked the PDS's and the Resource Master data (capacity profile) and all looks OK, I have tried different DS profiles with no luck.

 

Am I missing something.

 

Thanks in advance.