Matching dates in STO between ECC and APO

$
0
0

Hi Gurus,

 

I am looking for a solution where the ECC and APO dates for an STO should match. In ECC the STO is scheduled based on route (as per our setting) and APO is scheduled as per transportation lane.

Our transportation lane data is not accurate. So we want APO to adopt ECC dates. Is there an option for adopting ECC dates for STO.

 

If not I am looking for syncing Tlane duration from the routes. Can you recommend an option for this.

 

Thanks,

Gijoy