Quantcast
Channel: SCN : Popular Discussions - SAP APO - Production Planning, Interfaces and Global ATP
Viewing all articles
Browse latest Browse all 953

1:n product interchangeability

$
0
0

Hi Gurus,

 

We the below interchangeability scenario in gATP :

 

Product 309 => Products (310 and 311)

 

Have maintained the below :

 

  1. In /INCMD/UI have maintained suppression chain  - 309 =>(310 and 311) with replacement type 1:n - AND and 'valid from date' as 22.05.2015
  2. Assigned the above to a product substitution procedure
  3. Assigned the above product substitution procedure to a rule in /SAPAPO/RBA04 in tab 'prd + loc.subs (InC)'
  4. Assigned the above created rule in rule determination in /SAPCND/AO11
  5. No 'InC' selection in check instructions

 

When I create order for product 309 for 18.05.2015,product 309 is confirmed.

Rule assigned above is shown as selected in 'availability proposal screen'.Working well till here.

 

But when I create order for product 309 for 25.05.2015 (or any date beyond 22.05.2015),309 is neither confirmed nor replaced by (310 and 311).

 

 

Am I missing some setting ?

 

- Shankar


Viewing all articles
Browse latest Browse all 953

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>