Is there any way to drive two day lead time in APO

$
0
0

Hi Experts,

 

we have one issue , If a product goes into negative stock the system is planning to receive the stock on the same day that the stock is required, but we need to be able to supply this with a two day lead time.


The planning is happening at vendor location.


Can anyone please let me know if there is a function in APO master data that would drive this.


Thanks in advance.