Hi.
We are having some problems when we run the BOP in APO system to update dates and quantities of scheduling agreements. Some documents are being processed ok but others no (creation date <= dec 15, 2015).
This issue began after add a product (in dec 16, 2015) in the master data and all his corresponding configuration so that it would be considered in APO. These are the steps we follow to do this taks
- Add product number in Integration Models (product, Stocks and Trx Data, not in GATP model).
- Generate the corresponding Integration Models (IM).
- Deactivate IM (product, Stocks and Trx Data. Not GATP model).
- Activate the new ones.
- Run Master Data Process Chain.
- Add Characteristic Combinations by flat file in every Master Planning Object Structure.
- Verify and fix inconsistencies due to the new Characteristic Combinations in every planning area.
- Add product characteristics in //mat1 to link it with plants.
- Add product in transportation Lane and link it with a specific means of transport.
- Include all objects to Supply Chain Enginner.
- Copy Characteristic Combination from planning area.
Last week a user realized this problem. While we were analyzing this problem, we found in trx //CC (CIF Cockpit) the following error when executing BOP
Those entries in log correspond to sales documents that cannot be updated and as i said, creation date is less or equal to dec 15, 2015.
Does someone have a similar problem? Can you help me to solve it?
BR,
Julian.