CIF: Business Partner Type does not exist
I am transferring vendor from ECC to SCM both as vendor and partner. While activating the integration model I get an error saying that <Business Partner Type does not exist, choose either 1 or 2 or...
View ArticleHow to remove double counting of STO in ATP Scope of Check B in ECC
Hi Dears, We were facing an issue, wherein the ATP Scope in ECC for B had "Include Sales Requirement" due to which the Sales Orders/ STO's were visible in both A as well as B & hence double counted...
View ArticleSAP APO tables of Scheduling offset, Scheduling value of PP/DS orders
Hi, Please let me know where scheduling offset, scduling value of an planned order/ process orders is saved in SAP APO? How can I update the above values for an existing process order in SAP APO -...
View ArticleHandling Resource
Hi, To consider the GR processing time, handling resource is created and assigned in the location master. Handling resource is defined with a factory calendar, also the Shipping , Receiving calendar...
View ArticleFERT & HALB full from???
What is the full from of HALB(semi-finished) & FERT(finished) ?
View ArticleNo confirmation on Product Allocation
We are using GATP with RBA and I have configured PAL as the second step in the checking instructions, but when I enter a sales order and do the availabality check, the product allocation does not come...
View ArticlePooled capacity and setup activity
Hi Guys, I have a challenge where I use a pooled capacity in 2 operations where the primary resource is different between the operations. However the second operation should already start the setup...
View ArticleHow to Control the Dynamic Pegging Behaviour in CDP
Dear All, We are using Characteristic Dependent Planning (CDP) to plan configurable materials. The requirement is to control the behaviour of Dynamic Pegging of a dependent requirement to receipt. We...
View ArticleCIF error msg:Invalid time interval
Hi I generated prod.oder CIF from R3 to APO.But there was a error when activate integration model as below:Do you have any idea about those error?
View ArticleProduct interchangeability and ATP not working
Hi, I have done all required configuration for Product interchangeability along with ATP configuration as shown below, After heuristic run, substitute order and corresponding dependent requirement...
View ArticleProduct heuristic creates purchase requisitions on the same day
Hi, the snp planning run created purchase requisitions correctly to cover the demands as you can see below:everything looks good. but when I run the product heuristic in product view the system...
View ArticleCTM and scheduling agreements
Hi Is it true that CTM does not consider scheduling agreements while planning ? If yes then isnt this a very big limitation on the planning method ? Where can CTM be used then ? I know it helps u...
View ArticleGATP-CPS condition records change logs
Hi experts, May I kindly seek your help in checking changes made in the condition records of CPS (configurable process scheduling) in APO.The only field I see is Created By and Created On, which is...
View ArticleAssignment of components to particular phase of PP/DS process order while...
Hi, My requirement is to assign component to a particular phase (more than one phase exists) of process order in APO, while process order creation in PP/DS. By default, system assign the component to...
View ArticleCIF:APOR3 error code:/SAPAPO/CIF426
Hi Do you have any idea about CIF error:/SAPAPO/CIF426?( CCR check)Why does it occur?
View ArticleOnce confirmed should not be re-assigned to other orders
Hi Gurus, We have a requirement from our users that if a particular Sales Order type (ZEX) gets confirmed once, then it should not loose its confirmation during a BOP run for any other (even Higher...
View Articlebatch consideration in BOP
Hi, Our requirement for BOP is it should not consider the given Batch in sales order. Based on available stock it should give commit.Any suggestions highly appreciated. Thanks & Regards,Bala B.
View ArticleFERT & HALB full from???
What is the full from of HALB(semi-finished) & FERT(finished) ?
View ArticleUse of the transaction code SAPAPO/RRP3
Hello,Please let me know the purpose of the transaction code /n/sapapo/rrp3?Can we change the confirmed quantity of the sales order in this transaction code under "ATP" tab?thanks in advance for...
View Articlecan we see anywhere de-allocated Planned orders may be in Alert monitor?
Is there any way to see what are the planned orders or products deallocated may be in the Alet monitor or any other placeother than Detailed scheduling planning board seeing in different colour of...