FERT & HALB full from???

What is the full from of HALB(semi-finished) & FERT(finished) ?

View Article


SAP APO functionalities are not available on ECC 6.0

Hi,I have installed SAP ECC 6.0 IDES server but I am not able to use the SAP APO tcodes like /sapapo/mat1.Is there any specific add on or component that I need to install?

View Article


FERT & HALB full from???

What is the full from of HALB(semi-finished) & FERT(finished) ?

View Article

report showing planned vs. real production times

Hi, I am using APO 7.03 and try to find out if there is a possibility of comparing the planned vs. real production times. we need to compare the planned times maintained in operations of the routings...

View Article

Activate immediate change transfer of Z-table values from ECC to table...

Hi, I have some plant specific material values stored in Z-table in ECC. How to activate immediate change transfer of these Z-table values from ECC to table /SAPAPO/MATLOC in APO? Is message type...

View Article


where to specify source of supply in planning version

how to specify source of supply in planning version In the planning version, you can define for PP/DS whether the system may create a procurement proposal if no valid sources of supply are available.I...

View Article

How to exclude STOs from GATP, when we need to ship the "Customer return"...

How to exclude STOs from GATP, when we need to ship the "Customer return" products from branch to Central DC? We have to set up a scenario for sending "Customer returned" products from branches to...

View Article

Multiple orders converted from Planning Board

Hi Experts, If I trigger conversion (from Planned Order to Process Order) of a high number of orders from the Planning Board then the conversion indicators reach ECC succesfully but when ECC sends back...

View Article


Error for COM routine using application program (return code 40.134)

Hi, when i am trying to load data for a Material from a Planning Book/ Data View in Interactive Planning Book....facing the below error... Error for COM routine using application program (return code...

View Article


Orders are not visible in prod allocation assignment by order page for past week

Hi,    Not able to find the order number due to "document missing" status in the product allocation assignemnt by order pop up page.Issue in details: Getting "document missing " instead of document no....

View Article

FERT & HALB full from???

What is the full from of HALB(semi-finished) & FERT(finished) ?

View Article

Use of the transaction code SAPAPO/RRP3

     Hello,Please let me know the purpose of the transaction code /n/sapapo/rrp3?Can we change the confirmed quantity of the sales order in this transaction code under "ATP" tab?thanks in advance for...

View Article

Simulation version getting updated from active version

Hi all, We noticed that in Active Model 000, existing Simulation Versions are getting updated (changed) daily, even though we do not know any job scheduled by us which could do such update. I tried to...

View Article


APO-ERP Integration - Publication

Hi, I am trying to create the CIF Integration for the first time and see in APO that I have to make some settings for data transfer.my question is about the publication: 1. do I have to maintain the...

View Article

APO 7.03 - organizational areas for batches and CDP

Hi, I am using SAP ECC 6.0 with APO 7.03. We use shelf life planning and batch managmenet. In APO CDP is activated.I am trying to prepare APO for CDP and batches. Therefore I created organizational...

View Article


Difference in Material availability date for ECC ATP check & for APO ATP...

Hi Gurus, I have a question: on what basis material availability date is calculated in forward scheduling? Eg: For a customer GR hours are maintained in unloading point calendar in customer master and...

View Article

SAP GATP: Under which condition type i should add route,pick time,pack time...

Hi Experts, I have a issue where i need to maintain the ship to party and sold to party . I maintained both under codition type ULCA.Where i have mentioned the delivey open days.Now again i have to add...

View Article


APO PPDS Production Campaign

Hi, I use APO 7.03. I created production campaigns with a few planned orders. But face a few issues: 1. in Deltareport see following error: Production campaign 000000000014 exists in APO without an...

View Article

GATP BOP Issue with STOs

We have recently discovered a problem with GATP where BOP is not updating the committed dates in APO on STOs from our factory after the corresponding production order has been entered.  However if we...

View Article

Time in Sales order

Hello All, I have a case where in , i created a sales order at X Location and delivery to Y location which is 1 hour backward. For Eg: sales order is created on a friday and the system proposed...