Channel: SCN : Popular Discussions - SAP APO - Production Planning, Interfaces and Global ATP
Browsing all 953 articles
Browse latest View live

Availability date of batches not getting CIFed to APO

Hi Gurus, In my current project the batches are getting ciffed properly but the avail date in version tab of /sapapo/rrp3 is coming blank even if the dates are there in ECC side. Any idea why the...

View Article


Allocate the salesorder in different manufactruing plants ?

Hi All, I have 3 manufacturing plants where in the sales orders are available in the sales office and we need to distribute the sales orders to different manufacturing plants based on the capacity. we...

View Article


Fix Peg Prodn Orders coming over to APO

Gurus, We've a need to fix peg production orders, as they get CIF'd over into APO. We tried to use the Planning Procedure' Create/Change Production Order in the OLTP system event to trigger the action...

View Article

Consulting note for GATP shipment scheduling

Hi Experts, Looking for latest OSS Consulting note for APO shipment scheduling and detailed document setting up scheduling based on condition techniques. Thanks, Bijit

View Article

SO confirmation given at the end of Check Horizon

Hi ,  Sales order was partially confirmed for required delivery date and for remaining qty the conformation date was proposed at end of Checking horizon. There was sufficient stock to confirm the...

View Article


BOP Filter type information

Hello team, I ahve a small doubt regarding BOP filter type source location and destination . Could you please explain how it works and which location it will consider while running BOP. Here source...

View Article

Image may be NSFW.
Clik here to view.

Time stream issue...

Hello Team, We are creating the sales order in SAP R3,system checking the avaibility check in APO in backend but we are getting the  error message as shown in the below screen shot  screen shot. As per...

View Article

BOP overconfirms in case of partially delivered sales orders

The backorder processing ignores the quantity delivered, that is, it checks and confirms the entire order quantity thus having total confirmed quantity greater than ordered quantity.How to...

View Article


gATP and ALE

Hi Guru's, just a 'simple' question about gATP and ALE: when using gATP in an ALE scenario, is there anything to consider when having mixed orders ? ERP system 1, sending systemhaving some items...

View Article


Future dating deliveries in gATP / Product Allocation environment

Hi, We are working with Product Allocation and Global ATP.  Because the reliability of our incoming ATP elements is close but not exactly 100%, we allow allow CSRs in some agreed scenarios drop a...

View Article

Collate PO Memos in Product view

Hello All, We have implemented ASN in our scenario and currently PO memos appear in APO system for each batch.Each batch is shown as a separate item in product view(rrp3 transaction).This affects...

View Article

PP/DS - Plan determination - PPM

Hi, I need your help.  We have one product with two PPM. The modes duration are: First PMM with mode duration = 3,012/H and Second PPM with mode duration = 4,267/H. I do not understand why always the...

View Article

Zero Stock Show, How to Remove. ???

Dear All,  In COR6N Transaction in the Tab of Goods Movement in any Material Zero Stock is Show when am Pressing F4 Button in storage Location Tab . I want only available stock in Search Help. Kindly...

View Article


ATP confirmed quantity

Dear GATP gurus  Case 1:  If my sales order with requirement  quantity is 10000 which is created on 20/11/2015  , I have stock of 10000 available on 20/11/2015If  my issue limit is 00:00:00 and receipt...

View Article

Stop delivery creation for orders confirmed against planned receipts (ASN, PO...

Hi, Scope of check for Sales Orders (Business Event A) and Deliveries (Business Event B) includes Stock and Advanced Shipping Notifications(ASN or PO Memo) as receipt elements. Our requirement is to...

View Article


Grid colour s in scheduling board

Hi Team,  I have a production line (resource)  in 5  which finished product are manufactured.   In Detail scheduling planning board, my requirement is  to represent each product  by a colour.  how to...

View Article

CIF- GATP

Hi Experts, Can any one give some information on the difference between ATP Customizing and ATP Check in CIF integration model? Thanks,

View Article


APOCF011 - EXIT_/SAPAPO/SAPLCIF_STOCK_001 Issue

Hi, We have a requirement to change the ATPCAT for certain storage locations from CC to a custo one.We have defined the new atp cat 'ZS' and we have activated the enhancement APOCF011 in order to use...

View Article

To overwrite Routing values through Variant configuration procedure what are...

Hello Experts, We are going to use procedure in Variant Configurations. Following data have been maintained with reference to two BOM reference characteristics in APO SPRO settings. Logical...

View Article

Pl suguest the setting in ECC and APO to User Primary Resource first then...

Hi All, Please suguest the  setting/Config in ECC :so that In APO to  create Planned orders  for Primary resource/workcenter first after that when Overload Primary resource shift /create planned orders...

View Article