Quantcast
Channel: SCN : Popular Discussions - SAP APO - Production Planning, Interfaces and Global ATP
Browsing all 953 articles
Browse latest View live

Rule control key

Hi I am working on GATP configuration, I want to understand about the Rule Control and Rule Control Key.With out Rule Control key its not allowing me to proceed further. However in the configuration...

View Article


Determination of First Date in Sales Order

Hello SAP Friends,   Below is the issue we realised during the testing. The issue is with First date in the Sales Order which is not updated as per Unloading Point Calendar . As per details I received,...

View Article


how availabilty check is carried out in gatp

Dear expert  what are the configuration i need to make for availabilty check in GATP step wise

View Article

Offsetting component planned order with respect to header planned order.

Hi Guru, System is SAP APO PP/DS. Bom Header XBom component Y X planned order start date: 10/10/2014    -    End date  15/10/2014Expected Y planned order end date 6/10/2014. Instead of 10/10/2014 (as...

View Article

Alert Profile in DS planning board (PP/DS)

Hi, I have created an alert profile. I am assining the same alert profile in initial screen while executing DS planning board (PP/DS). But when I am going to Alert Monitor from DS planning board, I see...

View Article


Same batch number for different process order when converting in APO

Hi Gurus,We converted 6 process order of a material in RR4 (SAP APO), after converting we see the same batch number is assigned.Please suggest. Thanks in advance Regards,Rajesh

View Article

Finite tank planning in APO with PPM possible?

Hi gurus, I am preparing a PP/DS demo system (optimizer) for a beverage company. The idea is to model as much constraints as possible from their production system, and most of them seem to be related...

View Article

APO PPDS - classification of PP/DS-PDS

Hi, is it possible to classify the PPDS-PDS? we use PP-PI and I think of using CDP in APO. To make the production planning in APO PPDS I started thinking of introducing CDP in APO based on...

View Article


Incorrect Sourcing: CTP & Block Planning

Experts - dealing with the below situation Master Data set up–Finished Good A, consumes component B @ Plant # 1We use CTP with Block Planning to produce Matl B.Component B @ Plant # 1, sources of...

View Article


Settings to adjust order quantity to max. output of a machine

Hello, we have following issue: one product can be produced on two machines (tank resources): Machine A1 has max. capacity of producing 329,6 Kg Machine A2 has max. capacity of producing 438,7 Kg Now...

View Article

APO Planned order

Hi ,   i have below requirement..   In APO planned order / preq i want to see material revision level information .Step 1 : bringing material revision level info to APO ( material revision level ,...

View Article

Char based ATP check for stock

Hi, Two queries related to char based ATP check (its MTS)-- 1. Char based ATP check scenario is configured. The ATP check based on char is taking place correctly. System is creating sub-items for...

View Article

Hi Experts

We are using PPDS .I have a situation where my production order due date is showing 10/27 when all my components are available on 10/20 ( I checked this under context view ). What could be the reason...

View Article


Determination of First Date in Sales Order

Hello SAP Friends,   Below is the issue we realised during the testing. The issue is with First date in the Sales Order which is not updated as per Unloading Point Calendar . As per details I received,...

View Article

FERT & HALB full from???

What is the full from of HALB(semi-finished) & FERT(finished) ?

View Article


APO 7.03 product view - different date formats

Hi, when entering the date in product view of a pl order for example the system allows only the date format that is set in the user settings. Question: is there any possibility in APO for a particular...

View Article

APO Graphical planning board - scheduling of dependent orders

Hi, I set the "pp planning procedure" 3 (cover dependent requirements immediately) for all the semi-finished products in the product master (APO). When scheduling pl order of end product in the...

View Article


Image may be NSFW.
Clik here to view.

GATP issue : Closed STOs still visible in BOPI, but not in RRP3

Hi Experts, I am new to GATP and is facing an issue regarding to closed STOs. We are using BOP and in BOPI transcation, I can see some of the closed STOs have confirmations against them and is reducing...

View Article

Confirmed delivery date with Global ATP

Dear Gurus, We are investigating the possibility to use Global ATP. An important requirement for us is that ATP can meet a specificscenario which, from research, we cannot conclude whether Global ATP...

View Article

APO Firmed Planned Orders with conversion indicator has no numbers

Hi All, I am facing one issue w.r.t. APO Firmed Planned Orders with conversion indicator has no numbers in it. These orders are not stuck in the CIF queues and not getting converted to production...

View Article
Browsing all 953 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>