Quantcast
Channel: SCN : Popular Discussions - SAP APO - Production Planning, Interfaces and Global ATP
Viewing all 953 articles
Browse latest View live

Use of the transaction code SAPAPO/RRP3

$
0
0

     Hello,

Please let me know the purpose of the transaction code /n/sapapo/rrp3?

Can we change the confirmed quantity of the sales order in this transaction code under "ATP" tab?

thanks in advance for your help.

 

B Regards,

Bhaskar.K


Open Sales order details in APO

$
0
0

Hello Guru

 

I have a requirement where I want the report of open sales order till current date in the APO system. I have already explored below tables:

/SAPAPO/POSMAPN –  R/3 Object = 3 (sales order), Sales order Number

/SAPAPO/ORDADM_I –  Time stamp created on, Product ID, location ID

 

But am not sure how I can get which are the open sales orders from that. Or is there any BAPI or FM which I can call from APO to ECC to get this details.

 

Regards

Please share SAP APO-DP and CIF documents.

$
0
0

Dear Friends,

 

Can you please share the SAP APO and CIF documents.

 

actually want to go through the DP and CIF

 

Best regards

Sunil Patil

Product view enhancement - adding Primary Product to Elements tab as additional column

$
0
0

Hi Experts,

 

 

Beginner in APO here. This is an ABAP related question.

 

In Product view (Elements tab), for Dependent demands, I want to display the primary product on the same screen, in an additional column (Currently, one has to double click on the dependent demand to view the primary Product).

 

I've created the additional column through BADI ZPPDS_RRP_IO_COL, but not sure about the logic to populate it with the primary Product.

 

Inside method RRP_USEX_COLS_FILL_01 of the above BADI, I get the internal table CT_IO filled with all the GUIDs from the elements tab.

 

I want to know how to utilize them to fetch the primary product for the Dependent Demands.

 

 

Thanks !

 

 

Best Regards,

Bhuvan

APO PPDS (7.03) - Planning with setup / clean orders

$
0
0

Hi,

 

we use APO 7.03 with SAP 6.0. PPDS is run with PP-PI.

 

I wander what are the options for planing of setup / clean-up orders?

 

We think of introducing dummy products with a master recipe and a bom (empty=no components) and production version.

 

We could then manually create the planned / process orders for the setup or clean up activities of the machines / tanks.

 

But what about an automatic creation of setup / clean up orders on the machines / tanks? Is there any possibility that the system would generate the setup / clean up orders?

 

on some machines for semi-finished products we will produce one semi-finished product a day. Could we somehow setup the system to create automaticall the setup/ clean up orders before /after the production activity?

 

thank you for all helpful input!

 

best regards,

Pilvi

how the priorties used in location master are used in sapapo

$
0
0

Dear expert

 

how the priorties used in location master are used in sapapo PPDS

 

 

Thanks Regards

Virender

Third party order processing

$
0
0

Hi Experts,

 

Could some one please help me any  config doc/pdf for 3rd party order processing.

Could any one please help if somebody have already done with testing and screenshots for 3rd pop.

I red some help doc about the settings which are in check instructions, loc det. activity etc..

But unable to execute this processing in my system. Please..

thanks,

RBA issue

$
0
0

HI Experts,

 

The sales order is not confirming the qty from the RBA.

I am checking first 'product check' - is the first step

then ' activate RBA' is the second check.

 

This is the message i am getting when i clicks on 'Rule" tab as marked in the red. Could some one plz tell me what could be the wrong I have done.

I can also maintained the rules and I can see the pro/loc in the simulation also. But It is not confirming the sales order from RLUE.

 

 


APO Graphical planning board - scheduling of dependent orders

$
0
0

Hi,

 

I set the "pp planning procedure" 3 (cover dependent requirements immediately) for all the semi-finished products in the product master (APO).

 

When scheduling pl order of end product in the detailed scheduling planning board the dependent planned orders for all semi-finished products are rescheduled as well only if I schedule the pl order of end product backwards (heuristic or drag&drop).

But if I move the pl order of end product forward all the dependent pl orders of semi-finished products will not be rescheduled accordingly = remain in the same place

 

Question: What parameters shall I set so the system will reschedule the dependent planned orders if I move the planned order of end product forward?

 

thanks for all useful hints!!!

 

best regards,

Pilvi

Open Sales order details in APO

$
0
0

Hello Guru

 

I have a requirement where I want the report of open sales order till current date in the APO system. I have already explored below tables:

/SAPAPO/POSMAPN –  R/3 Object = 3 (sales order), Sales order Number

/SAPAPO/ORDADM_I –  Time stamp created on, Product ID, location ID

 

But am not sure how I can get which are the open sales orders from that. Or is there any BAPI or FM which I can call from APO to ECC to get this details.

 

Regards

Sales BOM items ATP Check in PO

$
0
0

Inter-company Purchase order should be able to explode the components of a sales BOM.

 

 

Main item (the product that is being exported to another country where the company has its own warehouse) is relevant for delivery

 

 

This PO is manually created (not an outcome of MRP or a sales order) with supplying plant in One country of Europe and delivery plant is another warehouse of Europe.

 

 

The expected result is components ATP check should confirm the main item that is relevant for outbound delivery.

 

 

How to make this happen ?

 

 

 

Let me know if the requirement needs expansion.  I did all kinds of google and oss search but can't land anything close to this.

 

 

Thanks

BS

A different type of requirement...can gATP help?

$
0
0

gATP Gurus,

Please take a look the following scenario....

1. Our customers require the materials to be delivered on a specific date(not before and not after)and we always do tha without issues.

2. For example we have stock of a material which is promised for 14 days from today and no more stock is available now.

3. Now we get a sale order asking for the same material 5 days from today. But the existing stock is with the sale order 14 days from today. The thing is we can produce the material in 7 days.

What we want to is this:

We want the systen to give the stock to the new sale order and create a manufacturing order with the CTP functionality which will service the 14 day sale order.

We know CTP generally will take care by creating a planned order for a sale order. But can we achieve our requirement seamlessly is the question I am pondering over.

Any help will be highly appreciate.

Thanks,

Subash

How to see distributed quantity of process order in APO (product view) and available for ATP as it is seen in MD04 with distribution key (GLEI).

$
0
0

Hi,

 

I have a process order with distribution function (GLEI key). We are not using PP/DS or SNP. So no PDS or PPM.

 

Due to distribution fnction, the output of the process order is equally distributed and in MD04, we can see every week, order product is received.

 

But in APO (/N/SAPAPO/RRP3) in both elements tab and for availability, the complete quantity of the order is available in the last day of process order completion.

 

In my case though we are transferring process orders and it is not getting distributed in the product view. In R/3 in the stock requirments list - MD04, the qty is distributed across start to end dates of the production order. However, in SCM in product view the whole qty is available at the end date.

 

How can we make the complete quantity visible in equal parts as we see in MD04 in ECC and distributed parts be available for ATP on respective distributed dates and not availabble at process order completion date?

 

Than you in advance.

 

Regards,

Surajit Das

Open Sales order details in APO

$
0
0

Hello Guru

 

I have a requirement where I want the report of open sales order till current date in the APO system. I have already explored below tables:

/SAPAPO/POSMAPN –  R/3 Object = 3 (sales order), Sales order Number

/SAPAPO/ORDADM_I –  Time stamp created on, Product ID, location ID

 

But am not sure how I can get which are the open sales orders from that. Or is there any BAPI or FM which I can call from APO to ECC to get this details.

 

Regards

Use of the transaction code SAPAPO/RRP3

$
0
0

     Hello,

Please let me know the purpose of the transaction code /n/sapapo/rrp3?

Can we change the confirmed quantity of the sales order in this transaction code under "ATP" tab?

thanks in advance for your help.

 

B Regards,

Bhaskar.K


Determination of First Date in Sales Order

$
0
0

Hello SAP Friends, 

 

Below is the issue we realised during the testing. The issue is with First date in the Sales Order which is not updated as per Unloading Point Calendar .

As per details I received, it should refer Unloading Point Calendar for ShiptoParty and populate the next working day as First date into Sales Order.

 

How is First Date determined in the sales order?  Is there any config settings which is based on Route to do this? Or Is it controlled purely based on settings done in Tcode: VOV8, Leadtime days? I do not think VOV8 settings is controlling that in our APO system.

 

I have checked MAD, Pick/Pack, GI date all are populated correctly, But First Date did not follow the logic Unloading Point Calendar of ShiptoParty.

 

Please let know your inputs in this regard.

 

Thank you

Satish Waghmare

BAPI_STSRVAPS_SAVEMULTI2 version Char length number range

$
0
0

G'day Team,

Lookin for guidance on BAPI_STSRVAPS_SAVEMULTI2 for version structure & length.  Client is interfacing stock to olad to P.book.  Using BAPI_STSRVAPS_SAVEMULTI2 bapi the version internal length is 10 Characters (herein Char10).  original thought is to load just prod code/loc type / atp categ...

understand the Version  = Reflects the differences of a product in various forms. For example, the ERP batches are displayed in the SCM system as product versions; so standrad would mimic ECC6 MMBE batch# / stg loc / atp cat.

Client looking to have a Char10 number, and even look to apply snro to allow auto numbering.

Continue to get erorr message "Version (batch) 1234567896 of product 0000000000000000000000000000000000007537 already exists" as the batch already exists. Even if RLCDelete the existing batch ref exists in liveCache.

 

If Char10 is used; why does APO on populating RRP3 / SDP94 planning book truncate from CHAR10 to CHAR4?  I need to advise developer correct steer.

Points awarded accordingly.

 

Many thanks,

Andrew Goz

APO Consultant

FERT & HALB full from???

$
0
0

What is the full from of HALB(semi-finished) & FERT(finished) ?

stock issue in gATP

$
0
0

Hi Experts,

 

I have a stock in ecc 99,882 for the material X and plant Y. The same stock (99,882) is available in APO for the product X and location Y.

 

The system is confirming the sales order even if I enter the quantity more than the available stock in APO (99,882).

The sales order is confirming even I enter 10 lakhs qty for the item in the SO (it is greater than than the available stock which is available in the APO/ECC)

 

Can you please help me what could be the wrong in this. Why system is confirming the sales order for whatever figure i enter.

 

Please help

 

Thanks,

PDS priority in PPDS

$
0
0

Hi,

 

I am struggling with the priority of PDS in APO PPDS (7.03)

 

Question:

how can I prioritise the production data structure in APO PPDS or the production versions when working with recipes (PP-PI)?

 

I am mean, I want to prioritise the production versions. I did read about how I can prioritise the PDS in APO (procurement priority).

 

My question is how I could set the priority on PDS in APO or the production version in ECC, eg. prod version 0010 has the highest priority, then 0020, and so on. So that APO chooses the 0010 when creating pl orders automatically.

 

I checked myself and it seems that in standard APO selects the latest created PDS, if all the priority relevant settings are the same. we don't use the quotation, procurement costs.

 

the prod versions differ sometimes by the receipe and sometime by the boms.

 

thanks!

 

best regards,

Pilvi

Viewing all 953 articles
Browse latest View live


Latest Images

<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>